RedDOT, a designer and builder of mobile HVAC systems and components for on- and off‑highway vehicles, faced a challenge validating nylon parts before expensive injection molding because machined metal prototypes didn’t mimic nylon’s snap-fit and shock-resistant properties. When Stratasys added FDM Nylon 12 to its Fortus 3D Production System, RedDOT joined the beta program to address this gap and bring production-grade thermoplastic prototyping in-house.
Using Stratasys’ Fortus system with FDM Nylon 12, RedDOT now produces functional nylon prototypes and snap-fit jigs and fixtures that match production part properties, enabling first-time-right designs. The move eliminated up to six-week product introduction delays, avoided costly tooling modifications and six-figure retooling in the worst cases, and even allowed fixtures that process hundreds of printed circuit boards every day.
Gary Hansen
Vice President and Chief Technology Officer