Case Study: i-Tork Controls cuts prototyping time from one month to one week and slashes costs with Stratasys Objet30 Pro

A Stratasys Case Study

Preview of the i-Tork Controls Case Study

i-Tork Controls Solves Prototyping Problems With PolyJet™ Technology

i-Tork Controls, a designer and manufacturer of electric and pneumatic actuators, struggled with slow, costly prototyping: outsourcing a gearbox prototype took about a month and cost roughly KRW 1.5 million, and an entry‑level 3D printer produced low success rates. To speed development and protect confidentiality, i-Tork engaged Stratasys for a PolyJet 3D printing solution.

Stratasys demonstrated a VeroClear benchmark and supplied the Objet30 Pro for in‑house prototyping, allowing visualization of internal components and far higher print success. With Stratasys’ solution i-Tork cut prototype lead time from one month to one week (≈76% faster) and reduced cost per gearbox prototype from KRW 1.5M to KRW 400K (≈73% savings), while lowering material and labor waste and improving design iteration speed.


Open case study document...

i-Tork Controls

Park Gyeon-seon

Senior Manager


Stratasys