Case Study: a food manufacturer doubles output with Sterling Engineering

A Sterling Engineering Case Study

Preview of the Food Manufacturer Case Study

a food manufacturer doubles output with Sterling Engineering's $10MM CapEx plan

The customer, a leading food manufacturer, sought to double its output within two to three years but lacked the internal engineering resources to develop a capital expenditure plan. Sterling Engineering was engaged to conduct an engineering assessment and create a strategic implementation plan to overcome these process design challenges.

Sterling Engineering developed a comprehensive three-year CapEx plan, which included high-speed production equipment and automation solutions. By executing the first year of this plan, Sterling Engineering helped the manufacturer increase production in key departments by up to 45%, reduce headcount by 10 persons, and significantly boost cooling capacity, all while working within the client's cash flow constraints.


View this case study…

Sterling Engineering

23 Case Studies