Case Study: Fortune 500 Manufacturer achieves 90% peak-demand reduction and $1.6M CAD savings with Stem's Athena battery storage

A Stem Case Study

Preview of the Fortune 500 Manufacturer Case Study

Solving Operational and Financial Challenges from Ontario’s Global Adjustment

Fortune 500 Manufacturer, a Scarborough, Ontario building materials plant, engaged Stem to address soaring energy costs driven by Ontario’s Global Adjustment (GA). The facility’s load regularly exceeded 10 MW, and staff were manually curtailing thermally driven equipment in response to unreliable peak predictions—an effort-intensive approach that still left the company exposed to GA charges based on the province’s five highest annual peak hours.

Stem installed a 5.3 MW / 8.5 MWh battery energy storage system and deployed its Athena® energy optimization platform to forecast peaks and autonomously optimize dispatch, while coordinating with the customer on likely peak hours. The Stem solution reduced the facility’s electricity demand to just under 1 MW (about a 90% reduction from typical load) and delivered approximately $1.6M CAD in savings.


Open case study document...

Stem

54 Case Studies