Case Study: Clark Steel Fabricators achieves $24,000 in 10-year energy savings with Stem

A Stem Case Study

Preview of the Clark Steel Fabricators Case Study

Clark Steel Fabricators - Customer Case Study

Clark Steel Fabricators, a single-site metal fabricator (18 kW / 30 kWh), needed to cut operating costs without disrupting production. They engaged Stem, deploying Stem Energy Superintelligence™ and its PowerScope analytics to monitor and optimize energy use.

Stem implemented its energy optimization system and PowerScope reporting to automatically capture and communicate savings. The result: hassle-free cost reductions with projected 10-year savings of $24,000, improved visibility into performance, and ongoing energy optimization by Stem.


Open case study document...

Clark Steel Fabricators

Kim Clark

Owner


Stem

54 Case Studies