Stem
54 Case Studies
A Stem Case Study
Clark Steel Fabricators, a single-site metal fabricator (18 kW / 30 kWh), needed to cut operating costs without disrupting production. They engaged Stem, deploying Stem Energy Superintelligence™ and its PowerScope analytics to monitor and optimize energy use.
Stem implemented its energy optimization system and PowerScope reporting to automatically capture and communicate savings. The result: hassle-free cost reductions with projected 10-year savings of $24,000, improved visibility into performance, and ongoing energy optimization by Stem.
Kim Clark
Owner