Case Study: Trianel Windpark Borkum moves 80 wind turbines damage-free with SpotSee ShockLog 298

A SpotSee Case Study

Preview of the Trianel Windpark Borkum (TWB) Case Study

Trianel Windpark Borkum moves 80 wind turbines safely with SpotSee

Trianel Windpark Borkum (TWB), a major offshore windfarm developer, faced the challenge of moving 80 large wind turbines to a site 250 miles offshore without installing any that had been damaged in transit. They needed to monitor for specific impact events that could cause a turbine to fail prematurely. SpotSee provided the solution with their ShockLog 298 impact recorders.

SpotSee's ShockLog 298 devices were used to monitor all 80 turbines during transport, storage, and installation. The recorders successfully identified the amplitude, direction, and duration of impacts, allowing TWB to understand damaging events. As a result, TWB was able to install all 80 turbines with the confidence that none had been compromised by damaging shocks during the complex logistics process.


View this case study…

SpotSee

36 Case Studies