Speckle
36 Case Studies
A Speckle Case Study
John Sisk and Son Ltd, an international engineering and construction company, faced a significant challenge in monitoring 1,700 off-site manufactured precast panels. Their process was inefficient, relying on time-consuming manual updates across multiple Excel trackers and word-of-mouth updates from manufacturing locations. They needed to move from this scattered, horizontal reporting structure to a centralized system for tracking progress, delivery, and installation.
By implementing Speckle, Sisk integrated field data and standardized their Quality Assurance process. Speckle’s object-based version-control system for 3D data, connected to Power BI, enabled the creation of a live dashboard for automated monitoring and reporting. This solution from Speckle yielded a 72% faster configuration and a 98% faster reporting time, turning a process that took days into one that takes minutes, resulting in major cost savings, reduced risk, and enhanced decision-making.