Case Study: HENN achieves real-time BIM coordination and faster bid validation with Speckle

A Speckle Case Study

Preview of the HENN Case Study

HENN saves 85% of dashboard build time with Speckle

HENN, an international architecture studio, faced a significant challenge while preparing a high-stakes bid for the Hanover Medical School complex. The client required all submissions to be made with BIM models for automated verification, where any data error could lead to disqualification. The team needed a reliable, visually intuitive way to ensure their complex BIM data was accurate and could be easily verified by multiple, distributed teams without a time-consuming export process.

The HENN team implemented Speckle to create a live 3D dashboard in Power BI. This solution visualized model data, allowing stakeholders to review room information and cross-reference project requirements without needing to open Revit. Using Speckle saved the team 85% of the time compared to building a custom solution, provided greater confidence in the design through instant compliance checks, and was a key factor in helping them win the demanding bid.


View this case study…

Speckle

36 Case Studies