Case Study: Game Ready achieves revolutionary therapeutic recovery with Speck Design

A Speck Design Case Study

Preview of the Game Ready Case Study

Game Ready launches GRPro 2.1 with Speck Design, delivering deeper, faster cooling

Game Ready, a provider of therapeutic recovery systems, approached Speck Design with a basic prototype for a new product. Their challenge was to transform this initial concept into a revolutionary and reliable system for active cold and compression therapy.

Speck Design provided comprehensive engineering and design services to develop the GRPro 2.1 System. Their solution involved a complete mechanical redesign of the connector hose assembly, an electrical overhaul of the control unit software, and a user-focused industrial design of the wraps and interface. The result was a robust, intuitive, and high-performance product that became a leader in its category, with research conducted by Speck Design also helping to bolster the customer's intellectual property portfolio.


View this case study…

Speck Design

47 Case Studies