Case Study: Anglian Water achieves on-time SAP project delivery and effective training with Solution-Soft's Time Machine

A Solution-Soft Case Study

Preview of the Anglian Water Case Study

Solution-Soft's Time Machine® Guarantees OnTime Project Delivery & Effective Training

Anglian Water, a leading UK water and wastewater provider serving around six million customers, faced a testing bottleneck during a complex SAP deployment (CRM, Billing, BW Management, MAU). Their teams needed to move system dates forward to validate application logic, but each change required shutting down SAP, Oracle, and servers, halting all testing and relying on multiple admin teams, which caused delays, resource strain, and risk of human error. Solution-Soft’s Time Machine product was used to address this problem.

Solution-Soft implemented Time Machine to simulate future test dates on the fly, allowing testers to run multiple concurrent tests in the same environment without involving system, application, or database administrators. This eliminated frequent shutdowns, reduced resource overhead, enabled on-time project delivery, produced “tremendous cost savings,” and improved training by providing a consistent, predictable dataset for SAP users.


Open case study document...

Anglian Water

Peter Walmsley

Technical Project Manager


Solution-Soft

50 Case Studies