Case Study: Kwetta achieves up to twice-faster EV charging and accelerated time-to-market with 3DEXPERIENCE SOLIDWORKS

A SolidWorks Case Study

Preview of the Kwetta Case Study

Unlocking the Potential Of Power Grids To Shorten EV Charging Times with 3DEXPERIENCE Works Solutions

Kwetta needed a fast, cost-effective way to develop and deploy high-power EV charging systems that unlock unused capacity on existing power grids to shorten charging times. To meet this challenge, Kwetta turned to SolidWorks' 3DEXPERIENCE Works cloud-based modeling, design, simulation, data management, and collaboration tools (including 3DEXPERIENCE SOLIDWORKS Premium and Professional).

Using SolidWorks’ 3DEXPERIENCE Works solutions, Kwetta designed a 200 kW scalable, grid‑optimized DCFC SkyHook charger and Prime Grid Gateway (supporting up to eight SkyHooks and up to 1 MW per gateway), cut development to market-ready designs faster (1,300+ unique parts and assemblies in 10 weeks with a single designer), halved charging times versus conventional systems, and reduced testing time and costs through simulation—accelerating deployment of charging hubs and overall time to market.


Open case study document...

Kwetta

Andrew Hall

Mechanical Design Lead


SolidWorks

589 Case Studies