SolidWorks
589 Case Studies
A SolidWorks Case Study
Victory Team – Dubai, a world‑champion Class 1 offshore powerboat racing team, needed to shorten development cycles and optimize hydrodynamics, aerodynamics and weight-to-performance ratios while meeting strict design requirements. To replace its legacy AutoCAD 2D workflow and standardize on a single 3D platform, the team selected SolidWorks (SolidWorks Premium) to improve visualization, collaboration and engineering throughput.
SolidWorks implemented a 3D design and analysis solution—including SolidWorks Simulation and SolidWorks Motion—enabling faster modeling, collision detection, torque/acceleration analysis and better supplier collaboration. As a result of the SolidWorks deployment, Victory Team shortened design cycles by 25–30%, reduced time to produce a race‑ready boat by about 15%, experienced fewer failed prototypes and increased project throughput, while reducing production issues from file incompatibility.
Edmond Husseini
Head of Technical Office