SolidWorks
589 Case Studies
A SolidWorks Case Study
Select Technologies, a full-service food plant equipment systems integrator, needed to accelerate development of electrical panels for its automation and systems-integration projects. To replace slow, manual AutoCAD LT workflows and integrate with its Microsoft SQL Server parts database, Select Technologies implemented SolidWorks’ SOLIDWORKS Electrical Schematic Professional.
Using SolidWorks and its open API to link the electrical-schematic database with Select Technologies’ central parts database, the company automated serial/fuse/material/wire labels, 2D panel layouts and other manual tasks. The result: panel schematic time cut from two days to one, drawing speed up 25–50%, about 2,033 man-hours saved per year, and measurable gains in accuracy, throughput and profit margins.
Shane Trotter
IT Manager