Case Study: Tigercat Industries achieves faster, more efficient product development with SolidWorks Enterprise PDM

A SolidWorks Case Study

Preview of the Tigercat Industries Case Study

Managing Forestry Equipment Development With SolidWorks Enterprise PDM

Tigercat Industries, a full‑range Canadian forestry equipment manufacturer, needed to accelerate product development, reduce documentation costs, and improve design collaboration and reuse across multiple plants that were accessing separate development servers. After realizing time and cost savings with SolidWorks CAD and SolidWorks Simulation, Tigercat implemented SolidWorks Enterprise PDM to address these challenges.

SolidWorks deployed SolidWorks Enterprise PDM (200 seats) to centralize the vault, automate and standardize workflows, and give cross‑departmental access to design data. The solution delivered tighter revision control, increased engineering speed and flexibility, eliminated costly paper documentation, improved collaboration across facilities and functions, and allowed Tigercat to manage several hundred thousand design archives more efficiently.


Open case study document...

Tigercat Industries

Corey Vantilborg

Engineering Systems Administrator


SolidWorks

589 Case Studies