Case Study: ZESAR (Turkish battery machinery manufacturer) achieves 66% faster time-to-market and wins €700K contract with SolidWorks

A SolidWorks Case Study

Preview of the ZESAR Case Study

Boosting Battery Equipment Production With SolidWorks Composer

ZESAR, a small family-owned Turkish manufacturer of custom battery-production machinery, needed a cost-effective way to demonstrate its technology and win new contracts without building expensive prototype units. To modernize its design workflow and improve credibility, ZESAR upgraded from AutoCAD 2D to the SolidWorks 3D development platform and implemented SolidWorks Enterprise PDM, later adding SolidWorks Composer after learning about it through their reseller.

Using SolidWorks Composer to create animations and documentation directly from SolidWorks models, ZESAR showcased machine operation for global clients, won a €700,000 contract, and shortened sales cycles. With SolidWorks solutions the company cut time-to-market by 66%, reduced design time by 70%, and lowered development costs by 60%, while also producing electronic manuals and speeding overall delivery.


Open case study document...

ZESAR

Yavuz Sariçam

Foreign Trade Manager


SolidWorks

589 Case Studies