SolidCAD
30 Case Studies
A SolidCAD Case Study
3D-P, a team of mining and positioning technology experts, faced challenges with inefficient design management and communication. Their processes relied on manual data entry and outdated methods for managing Bill of Materials (BOMs), which slowed them down as the company grew. They sought a PLM strategy to streamline workflows and improve data sharing from design to manufacturing. To address this, they partnered with vendor SolidCAD for an implementation of Autodesk's Fusion 360 Manage.
SolidCAD implemented Fusion 360 Manage, creating a centralized system for BOM management, documentation, and change control. The results were significant, with the team now taking a third of the time to manage BOMs and saving 7-10 hours of rework previously lost to human error. Fusion 360 Manage became their single source of truth, improving communication and ensuring all team members work with the latest data.