Case Study: Farmgép achieves 50% higher new-equipment revenue and 30% shorter manufacturing lead times with Solid Edge

A Solid Edge Case Study

Preview of the Farmgép Case Study

Using Solid Edge helps Farmgép design and build better sprayers

Farmgép, an agricultural-equipment manufacturer in Debrecen, Hungary, faced limitations from 2D design drawings, difficulty working with large assemblies, and file-management challenges when developing crop sprayers. To modernize its design process and support international customers, Farmgép adopted Solid Edge (including synchronous technology and the Insight design data management solution) to replace its legacy 2D workflow.

Using Solid Edge, Farmgép implemented concurrent engineering, easier modification of supplier assemblies, and automatic generation of 3D PDFs, DXF files and parts lists, enabling faster design-to-production handoffs. The result: manufacturing lead time fell by 30%, new-equipment revenues rose 50%, and export sales increased 60%—with Farmgép citing Solid Edge’s strong support and seamless migration as key factors.


Open case study document...

Farmgép

Tibor Tar

Senior Engineer


Solid Edge

143 Case Studies