A Solid Edge Case Study
Hydrauvision, a hydraulic power manufacturer, needed to ensure its products could withstand extreme operational rigors in rugged environments. To meet high international certification standards for a new, more powerful containerized unit and reduce its reliance on physical prototypes, the company turned to solutions from Solid Edge, including Solid Edge software and Femap software.
Using Solid Edge for detailed design and Femap for advanced simulation, Hydrauvision was able to accurately model and test all required loading conditions. This solution from Solid Edge enabled the company to achieve necessary certifications after building just a single prototype, resulting in an 80 percent reduction in the number of prototypes required compared to previous projects.