Case Study: Green Box improves turnkey plant design with Solid Edge

A Solid Edge Case Study

Preview of the Green Box Case Study

Green Box ships 1,000 machines a year with Solid Edge

Green Box, an Italian industrial chiller specialist, faced the challenge of designing highly customized, energy-efficient temperature control systems for its global clients without resorting to oversized, costly off-the-shelf solutions. To improve the integration from design to manufacturing for these turnkey plants, the company adopted Solid Edge software from Siemens Digital Industries Software.

By implementing Solid Edge to create virtual prototypes, Green Box enhanced its design-to-manufacturing integration. This solution allowed its engineering team to efficiently develop complete 3D models and documentation for custom, turnkey projects. The vendor's software supported the company's strong growth and 85% export share by enabling them to precisely right-size plants to customer requirements, avoiding excessive costs and consumption.


View this case study…

Solid Edge

263 Case Studies