Design/delivery of complex diagnostic equipment and installations reduced from 1.5 to 2 years down to 9 months

A Solid Edge Case Study

Preview of the Introtest Case Study

Case study about Introtest working with Solid Edge.

Open case study document...

Introtest

Alexander Kostin

Deputy General Director


Solid Edge

143 Case Studies