SolarEdge Technologies
20 Case Studies
A SolarEdge Technologies Case Study
Pacific Gas and Electric Company (PG&E) faced significant hurdles in its goal to electrify its 9,500+ vehicle fleet by 2045. The utility needed to scale its charging infrastructure without expensive electrical upgrades and required a hardware-agnostic platform to manage operations seamlessly. To overcome this, PG&E selected SolarEdge to implement its fleet charging management platform.
SolarEdge's solution provided dynamic load balancing to support more chargers on existing infrastructure and optimized energy use for cost reduction. The implementation resulted in immediate scalability, significant energy bill savings, and a full system deployment within 90 days, offering a future-proof model for other large-scale fleets.