Case Study: Alta Company Jsc cuts electricity costs by ~30% with SolarEdge

A SolarEdge Technologies Case Study

Preview of the Alta Company Jsc Case Study

Manufacturing Plant Cuts Electricity Costs by ~30% with SolarEdge

Alta Company Jsc, a biodegradable plastic packaging manufacturer, faced high electricity costs from its energy-intensive manufacturing facility in Ho Chi Minh City. Their challenge was to reduce these costs while also meeting Vietnam's FiT program regulations to export unused solar energy to the grid for revenue. They partnered with vendor SolarEdge Technologies to implement a DC optimized inverter system with Power Optimizers.

By deploying the SolarEdge solution, which included a dedicated energy meter for monitoring, the plant could maximize self-consumption of solar energy and efficiently export excess power to the grid. This enabled Alta Company Jsc to lower its monthly electricity costs by approximately 30% and generate additional revenue, all while ensuring compliance with local regulations through the SolarEdge Monitoring Platform.


View this case study…

Alta Company Jsc

Tu Minh Hoang

General Director


SolarEdge Technologies

15 Case Studies