Case Study: KMP ZT-GmbH achieves successful bridge design with SOFiSTiK FEA tools

A SOFiSTiK Case Study

Preview of the KMP ZT-GmbH Case Study

KMP ZT-GmbH uses SOFiSTiK for a 30-day trial and complex bridge design

The customer, KMP ZT-GmbH, faced the challenge of designing a complex architect-designed bridge over the Danube River with unusual load-bearing behavior. This extraordinary structure required structural analysis software with special features that go far beyond everyday applications. The vendor, SOFiSTiK, provided its FEA tools to meet this challenge.

SOFiSTiK implemented its FEA software for bridge construction, which covers both everyday and special applications. This solution successfully enabled the detailed design of the new replacement construction for the Linz railroad bridge. The customer has relied on SOFiSTiK for over 10 years, finding it to be the best software for tackling their most challenging projects.


View this case study…

SOFiSTiK

5 Case Studies