Case Study: Frampton Construction achieves scalable scheduling discipline with SmartPM

A SmartPM Case Study

Preview of the Frampton Construction Case Study

Frampton Construction cuts schedule review time from 2+ hours to 10 minutes with SmartPM

Frampton Construction, a construction firm operating in the Southeast, faced the challenge of scaling its project scheduling discipline beyond the expertise of a single leader. The company relied on inefficient manual processes like PDF reports and spreadsheets, which led to inconsistent schedule quality, limited executive visibility into project risk, and reactive problem-solving. To address this, they turned to SmartPM's automated project controls technology.

SmartPM provided a solution that moved the company from reactive to predictive management. The implementation involved validating the platform with historical data, comprehensive training, and integrating its analytics into monthly financial reporting. This shift allowed Frampton Construction to identify schedule compression and risk trends much earlier. The results included significant cost avoidance, reduced overtime, improved quality, and a dramatic reduction in schedule review time from hours to minutes. SmartPM became embedded in the company's culture, enabling sustainable adoption and accelerating scheduling maturity.


View this case study…

SmartPM

26 Case Studies