Vista Oil & Gas Saves 2.5 Days Drilling the Curve and Achieves Longest Slimhole Lateral, Neuquén Basin

A SLB Case Study

Preview of the Vista Oil & Gas Case Study

Case study about Vista Oil & Gas working with SLB.

Open case study document...

SLB

768 Case Studies