Al Khafji Joint Operations (KJO) needed to restore full wellbore access after routine pressure and temperature surveys found obstructions from hard calcite scale in 3.5-in tubing at multiple depths. The well had been shut in for five years, and KJO was looking for a more cost-effective alternative to a coiled tubing unit or workover rig. SLB, using the Torque-Action Debris Breaker wellbore cleanup and debris removal tool, provided a mechanical descaling option.
SLB deployed the Torque-Action Debris Breaker on slickline to jar down and apply torque to break up the scale, clearing accumulations to 3,652 ft and confirming tubing integrity. This allowed a memory pressure temperature survey to be run and reduced both inventory and total descaling time. The approach saved KJO an estimated USD 250,000 in well intervention costs.