Case Study: Chinarevskoye Oil Field Production Company increases liquids production fourfold with SLB’s TPS-Line ESP system and Lift IQ service

A SLB Case Study

Preview of the Chinarevskoye Oil Field Production Company Case Study

TPS-Line ESP System and Lift IQ Service Increase Production Fourfold for Zhaikmunai

SLB worked with Chinarevskoye Oil Field Production Company in Kazakhstan to address falling production in a remote well with declining reservoir pressure, unstable electrical power, and a 4-km pipeline to the separator. The operator also had no prior experience with electric submersible pumps, making restarts and deferred production a major concern.

SLB recommended and installed a TPS-Line electric submersible pump system, supported by the Lift IQ production life cycle management service for real-time monitoring and remote adjustment. The solution increased liquids production from 27 to 111 m3/d, stabilized ESP operation for more than a year, and reduced downtime during commissioning and restarts by enabling remote troubleshooting and optimization.


Open case study document...

SLB

768 Case Studies