SILDRIL K Shale Inhibitor Helps Save More Than USD 100,000 per Well in Operating Costs

A SLB Case Study

Preview of the Large WBM Drilling Operating Company Case Study

Case study about Large WBM Drilling Operating Company working with SLB.

Open case study document...

SLB

768 Case Studies