SLB
768 Case Studies
A SLB Case Study
SLB worked with North Sea Operating Company on a North Sea P&A operation that required efficiently section milling two windows of more than 100 ft in 13⅜-in casing and underreaming the open hole in a single trip so an abandonment cement plug could be placed. The company needed to reduce cost and regulatory risk while improving milling efficiency, and SLB proposed the ProMILL trip-saving milling and underreaming system with the WavEdge ridged milling element.
SLB implemented an integrated solution using ProMILL together with the WELL COMMANDER ball-activated drilling circulating valve to improve cuttings removal and eliminate a separate conditioning trip. The operator milled and underreamed 109 ft and 100 ft sections in single runs, achieved an ROP of 4.2 ft/h versus a field average of 3 ft/h, and cut the overall P&A operation by 7.5 rig days and USD 1 million.
North Sea Operating Company