Case Study: Alberta Gas Pipeline Company cuts hydrate-treatment costs by over 50% with SLB GT-7569 Kinetic Hydrate Inhibitor

A SLB Case Study

Preview of the Alberta Gas Pipeline Company Case Study

Produced water contamination reduced by 100% and volume of treatment chemicals lowered by 80% in remote Alberta pipeline application

SLB worked with Alberta Gas Pipeline Company, which was operating a remote pipeline in Alberta and needed to reduce the amount of chemicals used to control hydrates while avoiding produced water contamination and corrosion risk from methanol carryover into the amine plant. The company had been injecting methanol to prevent hydrate formation, but this increased costs and caused contamination issues.

SLB recommended and implemented GT-7569 kinetic hydrate inhibitor to replace much of the methanol treatment. After optimizing injection rates, the pipeline operated without hydrate formation at 0.13 galUS/min, produced water contamination was reduced by 100%, and the volume of treatment chemicals fell by more than 80%, cutting operational and chemical costs by more than 50%.


Open case study document...

SLB

768 Case Studies