Case Study: Gente Oil Ecuador delivers remote water and oil facility in 11 months with SLB's Early Production Facility

A SLB Case Study

Preview of the Gente Oil Ecuador Case Study

Early Production Facility Enables Building Remote Facility for Gente Oil Ecuador in 11 Months

SLB worked with Gente Oil Ecuador to address the challenge of building a produced water treatment and oil processing facility in the remote Amazon jungle of Ecuador. The project needed to handle extremely high water output from Singue Field while meeting environmental and operational requirements on a compressed timeline.

SLB used its OneSurface early production facility with standardized modular skids to streamline design, delivery, setup, and commissioning. The facility was delivered in a record 11 months, increased operational capacity by 200% to 35 Mbbl/d of fluid, enabled 20 Mbbl/d of water treatment for reinjection, and allowed 15 Mbbl/d of oil production while reducing water disposal costs and supporting environmental stewardship.


Open case study document...

SLB

768 Case Studies