Case Study: a leading India gas production company saves USD 450,000 with SLB’s ClearPAC HT fluid and OptiPac completion tools

A SLB Case Study

Preview of the Leading India Gas Production Company Case Study

ClearPAC HT Fluid Enables Gravel Pack, and Tools Save USD 450,000 in Offshore Well

SLB helped a leading India gas production company address the challenge of completely packing the openhole annulus of a high-temperature, highly deviated offshore gas well with a very narrow fracture gradient, while avoiding formation damage from polymer gels. The well was being prepared for an openhole gravel pack in offshore India, and the operator needed a low-rate solution that could transport ceramic proppant without settling.

SLB recommended ClearPAC HT polymer-free gravel-pack fluid with OptiPac Alternate Path openhole screens and an antiswab service tool, followed by a MudSOLV filtercake removal service. The solution enabled a 100% annular pack with no proppant settling, allowed the use of existing ceramic proppant inventory, cut proppant costs by 45%, and eliminated an extra run that saved about USD 450,000 in rig spread costs. The well later met production targets, and a second well in the field confirmed the design.


Open case study document...