Case Study: Cimarex Energy saves 26 hours in the Permian Basin with SLB PowerDrive Archer RSS

A SLB Case Study

Preview of the Cimarex Energy Case Study

Cimarex Saves 26 Hours in Permian Basin with PowerDrive Archer Slimhole RSS

Cimarex Energy was drilling the Black Powder well in the Permian Basin and needed to drill out 7-in casing, build a 10°/100-ft curve, and then drill the horizontal section in one run. SLB supported the project with its PowerDrive Archer slimhole rotary steerable system and a custom SHARC drill bit for high dogleg severity drilling and geosteering.

SLB’s 4¾-in PowerDrive Archer RSS and SHARC MDSi711 bit drilled the curve on plan, geosteered the lateral, and reached TD in a single run despite an abrupt formation change. Cimarex drilled 4,787 ft in 110.3 hours, eliminated an end-of-curve trip, and saved an estimated 26 hours of rig time.


Open case study document...

SLB

768 Case Studies