Case Study: Onshore Kuwait Equipment Company reduces downtime and decontaminates radioactive ESPs with SLB's BaSOL 2000 HP Scale Dissolver

A SLB Case Study

Preview of the Onshore Kuwait Equipment Company Case Study

BaSOL 2000 HP Scale Dissolver Delivers In Situ Decontamination of Radioactive ESPs Onshore Kuwait

SLB worked with Onshore Kuwait Equipment Company to address radioactive naturally occurring radioactive material (NORM) scale buildup in its electric submersible pumps (ESPs), which was causing mechanical failure risk, production interruptions, and costly well shut-ins and pump reconditioning.

SLB recommended and applied BaSOL 2000 HP scale dissolver for in situ decontamination of the ESP assembly, including heated circulation and topside sampling to confirm dissolution. The treatment successfully removed the radioactive scale, showed no radiation after treatment, reduced well downtime and remediation time, avoided surface handling of NORM-contaminated equipment, and delivered cost savings by eliminating unnecessary shutdown and top-side remediation.


Open case study document...