Case Study: Arabian Gulf Oil Company boosts production by 3,000 bbl/d with SLB GeoSphere reservoir mapping-while-drilling

A SLB Case Study

Preview of the Arabian Gulf Oil Company Case Study

AGOCO Brings Well Back to Production Using Reservoir Mapping-While-Drilling Service, Libya Desert

Arabian Gulf Oil Company (AGOCO) needed to convert a nonproducing vertical well in the Messla Field, Libya, into a horizontal sidetrack while managing significant structural uncertainty. With poor seismic resolution, drilling challenges, and the need to place the well at the top of the reservoir to avoid the oil/water contact, AGOCO turned to SLB for help using the GeoSphere reservoir mapping-while-drilling service.

SLB deployed the GeoSphere 475 service, alongside the Impulse integrated MWD platform and adnVision azimuthal density neutron service, to map the reservoir in real time and guide geosteering into the sweet spot. The solution identified faults, reservoir thickness changes, the shale cap, and the OWC, allowing AGOCO to avoid unwanted zones and bring the well back into production at 3,000 bbl/d with zero water cut and no NPT.


Open case study document...

Arabian Gulf Oil Company

Issa Alaogali

Reservoir Engineering Department Manager


SLB

768 Case Studies