Case Study: John Hyland Construction achieves centralized, transparent project communication and streamlined bidding with SKYSITE Technologies

A SKYSITE Technologies Case Study

Preview of the John Hyland Construction Case Study

John Hyland Construction Improves Communications Using SKYSITE Mobile App

John Hyland Construction, an Eugene‑based general contractor with over 300 local projects, was struggling with siloed information and a lack of transparency across multiple drawing versions—issues that threatened cost overruns, project delays and time‑consuming rework. To centralize communication and make large plan files and revisions visible to all stakeholders, they turned to the SKYSITE Mobile App from SKYSITE Technologies.

SKYSITE Technologies implemented its SKYSITE solution to overlay multiple drawing versions, enable hyperlinking between drawings, details, RFIs and ASIs, provide unlimited file sizes and track invites and access. The result was simplified bidding (ensuring subcontractors bid from the same documents), faster, more productive OAC meetings and field work, fewer change‑order disputes and measurable time savings and reduced rework thanks to quicker access to the correct, up‑to‑date drawings.


Open case study document...