Aukera, a renewable energy asset management company, faced a challenge during the construction of a solar farm where traditional biweekly site visits failed to detect a critical pile deviation early enough. This issue threatened to cause significant structural clashes and costly delays. To gain better visibility, they employed Sitemark's drone-based construction monitoring platform.
Using Sitemark, Aukera received an early warning of the deviation between consecutive drone flights. This allowed them to immediately investigate and provide their contractor with clear evidence, preventing the problem from escalating. The early detection provided by Sitemark saved an estimated 3-4 months in delays and between £50,000 to £100,000 in rework costs, transforming the service from a perceived nice-to-have into a must-have tool for their projects.