Case Study: Controlant triples data logger production with Simul8

A SIMUL8 Case Study

Preview of the Controlant Case Study

Controlant triples data logger production by 275% with SIMUL8

Controlant, a leader in real-time supply chain monitoring, faced a critical challenge during the Covid-19 vaccine rollout. The massive demand for a vaccine requiring ultra-cold storage meant they needed to drastically increase production of their IoT data loggers to ensure safe global distribution. They turned to Simul8 simulation software to model and optimize their manufacturing process.

Using Simul8, Controlant's team built a model of their production line to identify constraints and experiment with staffing configurations risk-free. The simulation enabled them to find the optimal staff allocation, which led to a 275% increase in productivity, tripling weekly output. This optimization by Simul8 allowed Controlant to meet urgent demand and contributed significantly to the safe delivery of vaccines worldwide.


View this case study…

SIMUL8

55 Case Studies