Boston Scientific saves over $150,000 by using simulation to remove manufacturing bottlenecks

A SIMUL8 Case Study

Preview of the Boston Scientific Case Study

Case study about Boston Scientific working with SIMUL8.

Open case study document...

Boston Scientific

James Larson

Principal Industrial Engineer


SIMUL8

27 Case Studies