Simio
65 Case Studies
A Simio Case Study
The US Air Force faced a challenge in managing the phase maintenance cycle for its F-16 fleet, where random factors like unscheduled maintenance and hard breaks diminished aircraft availability. Their planners needed a way to assess fleet health, identify scheduling risks, and conduct what-if analysis on their maintenance schedules. They turned to Simio to develop a risk-based planning and scheduling simulation.
Using Simio, a simulation model was built to serve as a visual scheduling tool that tracks each aircraft's state and assesses the risk of failure. The solution incorporated reliability logic via Markov Chains and provided real-time analytics through Gantt charts and control charts. Simio's model is expected to increase aircraft availability by 10-15% by allowing planners to quantify risk and prioritize aircraft with acceptable rest periods, providing a more balanced and reliable fleet distribution.