A Simio Case Study
A global CPG snack foods manufacturer faced critical inefficiencies in its production scheduling. The company's manual, spreadsheet-based process took over two hours per plan and struggled with the complexity of synchronizing approximately 30 packaging units across continuous production lines with strict contamination and sequencing constraints. This inability to respond to disruptions and run scenarios severely hampered operations. Accenture partnered with the manufacturer to implement a solution using Simio.
The solution was a cloud-native, simulation-based scheduling platform built with Simio. It featured an embedded Python ETL for data integration and was connected to Power BI for visualization. This implementation reduced scheduling time from over two hours to just one minute—a 99% reduction. The Simio solution also enhanced demand adherence, enabled real-time scenario analysis, and provided the scalability for future innovation across the enterprise.
Global CPG Snack Foods Manufacturer