Boeing Wichita, a historic aerospace manufacturer, faced a critical capacity planning challenge in its paint facility. The introduction of new, larger aircraft components that required two processing cycles, combined with complex operational constraints, threatened to exceed the capacity of its existing infrastructure. Traditional Excel-based analysis was inadequate for modeling this complexity. Boeing partnered with vendor Simio to leverage its discrete event simulation capabilities to accurately model the facility and identify future bottlenecks.
Simio's solution involved creating detailed simulation models of both the current and future state operations. This analysis provided Boeing with data-driven insights, revealing that the existing facility could not meet future demand and identifying an optimal future configuration using spin-cure technology. The results enabled Boeing to optimize equipment selection, reducing the total number of pieces needed, and to precisely size buffers and layout for a new facility, ensuring they could meet delivery commitments without over-investing in capital equipment.