Integrated CAD-CAE system reduces physical prototypes by 80 percent, cuts raw material use by nearly one-third, and shrinks design cycle time by 50 percent

A Siemens PLM Case Study

Preview of the AVTEC Case Study

Case study about AVTEC working with Siemens PLM.

View this case study…

AVTEC

Neelakandan Varatharaj

Senior Manager R&D


Siemens PLM

919 Case Studies