Minova, a building materials manufacturer, faced a significant challenge due to a lack of visibility into its production downtime and shift inefficiencies. Relying on manual logs and spreadsheets, the company was unable to proactively identify where time and capacity were being lost, resulting in an overall uptime of only 49%. To address these hidden losses, they partnered with Shoplogix.
Shoplogix implemented its smart factory platform, connecting Minova's welding machines and stamping presses to provide real-time dashboards and granular, actionable insights. This solution delivered dramatic results, including a 10% increase in uptime and a reduction in downtime events by up to 75%. By turning invisible losses into visible gains, Shoplogix helped Minova achieve over $110,000 in annual savings.