SharpeSoft
37 Case Studies
A SharpeSoft Case Study
GT Weldon Construction, LLC, a general engineering and oil field services contractor, faced challenges with outdated, inefficient estimating processes that relied on manual paper-based methods and a complex Excel spreadsheet. Upon taking over as CEO, Mike Weldon knew the company needed to embrace technology to compete and facilitate knowledge transfer for future growth. This led them to seek a new solution from vendor SharpeSoft and its Estimator product.
The solution implemented was the SharpeSoft Estimator, which was praised for its ease of use, intuitive Workflow Navigator, and excellent implementation and support. The results were significant time savings, with the CEO estimating an efficiency improvement of more than 50%. The software removed risk from the process, made bid reviews easier, and ultimately brought the joy back to estimating for the team. SharpeSoft provided a foolproof system that was easy to learn and integrated seamlessly into their workflow.