Case Study: URETEK achieves safer high-speed rail ground improvement with Senceive track monitoring

A Senceive Case Study

Preview of the URETEK Case Study

URETEK monitors Bologna-Rimini track movement every 30 seconds with Senceive

URETEK required a rail condition monitoring system to ensure trackbed movement stayed within acceptable levels during ground improvement works involving the injection of expansive resin along the Bologna-Rimini high-speed railway line. The challenge was to detect small changes in track geometry in near real-time with minimal disruption to train services. Senceive provided the monitoring solution using their FlatMesh™ High-G tilt sensors.

Senceive implemented a system of 24 triaxial tilt sensor nodes and four communication gateways to monitor track movement. The team used the WebMonitor™ data visualization platform to view updates every 30 seconds and receive alerts if movements breached design limits. This near real-time data allowed URETEK to carry out the injection works with precision, avoiding any movement outside acceptable levels, ensuring safer working and reducing disruption to the train service.


View this case study…

Senceive

83 Case Studies