Case Study: TenneT achieves real-time track stability monitoring with Senceive

A Senceive Case Study

Preview of the TenneT Case Study

TenneT monitors track stability every 10 minutes with Senceive

The customer, TenneT, faced the challenge of ensuring the safety of a double-track railway line during a complex microtunnelling operation for the East Coast Line energy project in Germany. They needed to monitor the track's geometry for any changes in near real-time. Vendor Senceive's wireless monitoring technology was selected to provide the solution.

Senceive implemented a system using 48 NanoMacro Triaxial Tilt Sensors and six Optical Displacement Sensors to measure track geometry and lateral displacement. The solution provided precise, real-time data with automated alerts, ensuring continuous operation and track stability throughout the project. This allowed TenneT and construction teams to safeguard the railway with minimal disruption, successfully mitigating risk during the tunnelling phase.


View this case study…

Senceive

83 Case Studies