Case Study: Network Rail achieves proactive drainage risk monitoring at Wimbledon with Senceive wireless monitoring

A Senceive Case Study

Preview of the Network Rail Case Study

Network Rail validates drainage remediation over 6 months with Senceive

Network Rail faced a challenge with a flooding manhole and drainage system in Wimbledon that posed a risk to critical rail infrastructure. To validate recent remediation work, they required a robust solution for near real-time alerts on rising water levels and partnered with Senceive for a monitoring system.

Senceive implemented a wireless drainage monitoring system using a water level sensor and a solar-powered 4G camera. This solution provided near real-time data and visual verification, enabling proactive risk management. Over a six-month monitoring period, the data validated the effectiveness of the remediation works, ensuring the continued protection of the rail infrastructure and reducing the need for on-site inspections.


View this case study…