Case Study: Network Rail protects trackbed stability with Senceive wireless monitoring

A Senceive Case Study

Preview of the Network Rail Case Study

Network Rail safeguards trackbed stability with Senceive during 20 km roadworks project

Network Rail, alongside contractor Balfour Beatty, faced the challenge of safeguarding a railway trackbed adjacent to the construction of a major bridge for the Norwich Northern Distributor Road. The proximity of the construction work to active passenger and freight lines created a risk of deformation, necessitating a highly accurate monitoring solution. They chose Senceive to implement a system using wireless tilt sensors due to their proven reliability and ease of installation.

Senceive installed 106 FlatMesh™ triaxial tilt sensor nodes on the sleepers of both railway lines. The data was transmitted wirelessly via a solar-powered gateway to their WebMonitor™ software. The highly sensitive system detected movements, which were initially attributed to diurnal temperature patterns. By applying a 24-hour rolling median filter to the data, Senceive's solution enabled the team to accurately distinguish these normal movements from those caused by construction or train traffic, ensuring the project proceeded without disrupting the critical rail infrastructure.


View this case study…

Senceive

83 Case Studies