Case Study: FGC / Infratec/instop improves Montserrat Rack Railway safety and maintenance with Senceive wireless monitoring

A Senceive Case Study

Preview of the FGC / Infratec/instop Case Study

FGC / Infratec/instop monitors the Montserrat rack railway with Senceive for up to 15 years without maintenance

The customer FGC / Infratec/instop faced a challenge monitoring the historic Montserrat Rack Railway in Spain, where large seasonal temperature fluctuations caused significant track movement. To safeguard the railway and ensure passenger safety, they needed to understand the relationship between temperature and track geometry. They partnered with Senceive to implement a wireless rail monitoring solution for this data.

Senceive installed a system using their PT100 RTD sensor nodes with integrated tiltmeters and triaxial tilt sensor nodes to monitor the track, rack, slopes, and catenary poles. Data was transmitted via FlatMesh™ Gateways to Senceive’s WebMonitor™ platform, which provided alerts for movement outside safe thresholds. The installation was completed without disrupting service, and the data provided has led to more effective management and maintenance of the railway.


View this case study…

Senceive

83 Case Studies